ASB's Norway Mission Summer 2021
ASB team went to Norway in the summer of 2021 towards the next exciting installations of our squash courts.
The first ever ASB SquashCourt (ASB System100) installed at the Lofoten islands was the part one of the mission. What an exciting destination that was! Our team had to deal with a single court installation built of custom-made elements.
The trip then continued to Ornes where another two ASB SquashCourts (ASB System100 with ASB Pro GlassBackWall) were installed. The side-by-side setup took approximatelly two weeks to be finished and prepared for squash action.
Result: Mission accomplished!
Looking forward to our next projects in this beautiful country!